BP109252 - 750 Third St -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP109252 - 750 Third St -- Scanned | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 750 Third St -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP109252 |
| Date Application Submitted: | August 23, 2005 |
| Application Description: |
New Nanaimo Ice Centre (Twin Arena) Main floor area 5460m2, mezzanine 1004m2. 1 hr fire separation between mezzanines 3 exits and the remainder of the building, fire rated shutters protect exit stair #3 from window openings; 1.5 hr fire separation at Zamboni storage area; 1 hr fire separation at mechanical room, refridgeration room and 2 storage rooms; 2 hr fire separation at elevator and adjoining machine room. Occupant load 722 on mezzanine, 209 on main floor, total 931. Building classification A-3 - 3.2.2.29 sprinklered with fire alarm, non-combustible construction, floor assemblies 2 hr fire separation, mezzanines 1 hr FRR., load bearing supports FRR as required for assemblies. Oct. 28, 05 Required Equivalency Report for exit width received and accepted. VS |
| Application Status: | COMPLETED |
| Permit Value: | $8,340,000.00 |
| Builder: | TASK CONSTRUCTION MANAGEMENT INC |
| Issued Date: | October 24, 2005 |
| File Close Date: | February 12, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 750 THIRD STREET | PRC1 , PRC3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
SCHEDULED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2006-10-31 |
| OCCUPANCY-OLD |
PASSED
2009-02-12 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)