BP109199 - 198 Colvilleton Trail
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP109199 - 198 Colvilleton Trail | |
|---|---|
| Neighbourhood: | Protection Island |
| Street Address: | 198 Colvilleton Trail |
| Type of Application: | Locate Permit |
| File Number: | BP109199 |
| Date Application Submitted: | August 17, 2005 |
| Application Description: |
Relocate SFD (from Victoria) and create suite in lower floor. Added and changed windows, added laundry to upper floor, moved lower laundry and added bedroom, added two wood stoves. March 6th, 2008. Deck portion of permit has been deleted. See BP112541 This permit complete see above BAL |
| Application Status: | COMPLETED |
| Permit Value: | $52,000.00 |
| Building Area: |
193.00 M2 2,077.43 ft2 |
| Issued Date: | September 30, 2005 |
| File Close Date: | March 11, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 198 COLVILLETON TRAIL | R3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
|
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe connection must be visible for inspection. |
PASSED |
|
STORM CONNECTION
Pipe connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
SOLID FUEL BURNING APPLIANCE
For the inspection of a solid fuel burning appliance |
PARTIAL |
|
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)