BP109099 - 4235 Departure Bay Rd
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP109099 - 4235 Departure Bay Rd | |
|---|---|
| Neighbourhood: | Departure Bay |
| Street Address: | 4235 Departure Bay Rd |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP109099 |
| Date Application Submitted: | July 20, 2005 |
| Application Description: |
St Andrews Presbyterian Church. Addition to the existing building Existing building 60 ft.x 32 ft. New addition = 15 ft.x32 ft. two-storey addition and two 8.5 ft. x 9 ft. entrance additions with ramps for persons with disabilities. Part 3, 3.2.2.25, 45 min FRR/FS for the floor assembly and 45 min FRR/FS for the roof assembly. Building unsprinklered, 2 storey, basement area = 222.96m2, upper floor = 234.48 m2 areas includes the addition. Nelda has folder to proceed with Notice on title. 2007-SEP-19. Physical File Scanned + attached Sep 24, 2008 db |
| Application Status: | COMPLETED |
| Permit Value: | $91,100.00 |
| Builder: | HJ TURNER CONTRACTING (NANAIMO) LTD |
| Issued Date: | December 06, 2005 |
| File Close Date: | April 11, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4235 DEPARTURE BAY ROAD | CS1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)