BP109078 - 5360 Rutherford Road -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP109078 - 5360 Rutherford Road -- Drawings Scanned/Attached
Neighbourhood: Linley Valley    
Street Address: 5360 Rutherford Road -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP109078
Date Application Submitted: July 18, 2005
Application Description: Fifth phase of the 25 unit townhouse development -
1 two storey sprinklered (by bylaw) Duplex with partial basement on slab and partial crawl on lower level one side and crawl only on other side, attached garages (unsprinklered), 1 hour FRR/fire separation between units.
Block 6, unit 10- 5779 Garnet Place - 187.5m2, garage 37.3 m2
Block 6, unit 12- 5777 Garnet Place - 152 m2, garage 41.2 m2


REINSPECT FEE TO BE PAID BEFORE ANY OTHER INSPECTIONS. lm

Reinspection fee paid. 2005-Dec-21. lm

Application Status: COMPLETED
Permit Value: $329,000.00
Builder: 679327 BC LTD
Issued Date: October 31, 2005
File Close Date: May 31, 2006

Associated Properties

Address Zone More
5779 GARNET PLACE R6 Property Report
5777 GARNET PLACE R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

FAILED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

FAILED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2006-05-31

OCCUPANCY-OLD PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.