BP109062 - 1273 Island Hwy S (Bldg A) (Parent = 1275 Island Hwy S) -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP109062 - 1273 Island Hwy S (Bldg A) (Parent = 1275 Island Hwy S) -- Drawings Scanned/Attached
Neighbourhood: Harewood    
Street Address: 1273 Island Hwy S (Bldg A) (Parent = 1275 Island Hwy S) -- Drawings Scanned/Attached
Type of Application: Commercial / Multi-Res Alteration
File Number: BP109062
Date Application Submitted: July 13, 2005
Application Description: added patio does not increase occupant load ensure h/c/ accessible recalculated occupant load to 150 patrons on February 2, 2006 installed panic hardware on exits doors , Fire department posted OL on February 2, 2006
DVP00090 varied parking by 36 parking stalls to accommodate a 150- seat pub.
Chase River Arms Pub : Group A, Division 2, 290m2 , Occupant Load 65 patrons, 2 exits, 2 hr. fire separation /fire resistance rating between this unit and Group E adjacent Unit. New kitchen with kitchen exhaust to NFPA 96 , providing new washroom for persons with disablilites and female washroom with 3 water closets and male washroom with 1 water closet/1 urinal.

Existing Building. "A" 15022 sq ft, one storey, non-combustible roof , sprinklered, without fire alarm, building. (3.2.2.21, 1992 BCBC and 3.2.2.25, 1998 BCBC );
Application Status: COMPLETED
Permit Value: $60,000.00
Building Area: 290.00 M2
3,121.53 ft2
Builder: VIA CONTRACTING LTD
Issued Date: August 04, 2005
File Close Date: November 23, 2005

Associated Properties

Address Zone More
1275 ISLAND HIGHWAY S CC3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2005-11-23

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.