BP108948 - 3268 Serabi Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108948 - 3268 Serabi Place | |
|---|---|
| Neighbourhood: | Hammond Bay |
| Street Address: | 3268 Serabi Place |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP108948 |
| Date Application Submitted: | June 21, 2005 |
| Application Description: |
for construction of a two storey single family dwelling,partially finished basement on slab,attached two car garage. Structural Engineering was recieved Aug 8, 05 for overhieght fouindation. LK New proposed roof peek added Aug 8, 05 LK October 11 Revision - 8/12 trusses added to roof - 80% of the roof is now over 8/12 pitch. The max allowabe height increases to 8.53 m because this is an area H zone and 80% of the roof is over 8/12 pitch. cb |
| Application Status: | COMPLETED |
| Permit Value: | $244,966.60 |
| Building Area: |
299.32 M2 3,221.85 ft2 |
| Builder: | GEORGIA VIEW HOME BUILDERS LTD |
| Issued Date: | July 18, 2005 |
| File Close Date: | December 22, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3268 SERABI PLACE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
CANCELLED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2005-12-28 |
|
FINAL
Final approval as per requirements on plans. |
PARTIAL |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)