BP108882 - 3233 Willowmere
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108882 - 3233 Willowmere | |
|---|---|
| Neighbourhood: | Pleasant Valley |
| Street Address: | 3233 Willowmere |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP108882 |
| Date Application Submitted: | June 03, 2005 |
| Application Description: |
Split level one storey unfinished daylight basement on slab with attached double garage. Aug 8 / 05 Revision - extend great room jut out - cb Revision - Sep 13/05 - Basement fully finished. DG Revision - Oct 18/05 - Basement revised for secondary suite (964 sq ft) at 35 % of total floor area. DG |
| Application Status: | COMPLETED |
| Permit Value: | $155,000.00 |
| Building Area: |
133.78 M2 1,439.99 ft2 |
| Builder: | RATHY DOUG CUSTOM CONTRACTING |
| Issued Date: | July 06, 2005 |
| File Close Date: | January 04, 2006 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3233 WILLOWMERE CRESCENT | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
CANCELLED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PARTIAL |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2006-01-04 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)