BP108823 - 5360 Rutherford - Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP108823 - 5360 Rutherford - Drawings Scanned/Attached
Neighbourhood: Linley Valley    
Street Address: 5360 Rutherford - Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP108823
Date Application Submitted: May 24, 2005
Application Description: Fourth phase of the 25 unit townhouse development - "Rocklands"
1 - two storey sprinklered duplex with partial basement on slab and partial crawl on lower level, attached garages (unsprinklered), 1 hour FRR/fire separation between units.
Block 7, unit 13- 5770 Garnet Place - 187.85 m2, garage 40 m2
Block 7, unit 11- 5772 Garnet Place - 187.85 m2, garage 40 m2

1 - one storey sprinklered duplex on crawl space, attached garages (unsprinklered), 3/4 hour FRR/fire separation between units.
Block 8, unit 14 - 5771 Garnet Place - 152 m2, garage 41 m2
Block 8, unit 16 - 5769 Garnet Place - 142.7 m2, garage 43 m2
Application Status: COMPLETED
Permit Value: $527,200.00
Builder: 679327 BC LTD
Issued Date: July 11, 2005
File Close Date: February 23, 2006

Associated Properties

Address Zone More
5771 GARNET PLACE R6 Property Report
5769 GARNET PLACE R6 Property Report
5772 GARNET PLACE R6 Property Report
5770 GARNET PLACE R6 Property Report
5360 RUTHERFORD ROAD R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD PASSED

2006-12-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.