BP108807 - 25 Gillespie

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP108807 - 25 Gillespie
Neighbourhood: South End    
Street Address: 25 Gillespie
Type of Application: Locate Permit
File Number: BP108807
Date Application Submitted: May 19, 2005
Application Description: Locate a one-storey sfd, on new a foundation with a partly finished basement including a detached double garage.

Revision - Oct 05/05 - Windows and location revised on right elevation. Point loaded lintel in basement at right rear. DG

Added bar sink, March 23, 2007 LK

Mar 2009 - File is at Tom W's desk. See events.

Physical File Scanned + attached Jun 22, 2009 db
Application Status: COMPLETED
Permit Value: $42,000.00
Building Area: 210.00 M2
2,260.42 ft2
Issued Date: July 11, 2005
File Close Date: April 21, 2009

Associated Properties

Address Zone More
25 GILLESPIE STREET R5 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concete.

PASSED
STORM CONNECTION

Pipe connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe Connection must be visible for inspection.

PARTIAL
CHIMMEY

To be inspected while all components and clearances are visible.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PARTIAL
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

PASSED

2009-04-21

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.