| Application Description: |
Medical Arts Centre & Laboratory - 744.5m2 suite. Work includes addition under existing roof to enlarge building by 3.25m2, closing off 3 exterior doors, add 5 skylights, interior partitian walls for offices and staff rooms, sinks in most rooms, 7 washrooms (2 "accessible"), sprinkler changes. Plumbing under BP108871. Building Classification 3.2.2.57, Non combustible construction , Sprinklered , Fire alarm, 2hr FRR/FS for the roof top parking. Exits 2hr FRR/FS. Unobstructed 5m corridors. Fire protection Report for the use of combustible component , March 16, 1989 Report. |
| Application Status: | COMPLETED |
| Permit Value: | $250,000.00 |
| Building Area: |
744.50 M2 8,013.72 ft2 |
| Builder: | RW (BOB) WALL LTD |
| Issued Date: | June 23, 2005 |
| File Close Date: | October 05, 2005 |
Process Steps
| Task | Status |
|---|---|
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2005-10-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)