| Application Description: |
x reference bp108542 for the foundation and on-site servicing. Future permits for all tenants and all exterior signage. Shell permit only includes roughin plumbing and demising walls Building Classification 3.2.2.60 , Group E, 6739.9 m2, Sprinklered, fire alarm Building to be divided into 3 Suites. 45minutes (minimum) fire separation/fire resistance rating between suites. Demising walls to be continuous to the under side of the roof deck. CRU A: (Future Petsmart):1623 m2, CRU B: (Future Home Sense): 2136.7 m2, CRU C: (Future Home Outfitter's) 3974.66m2 received sprinkler drawings and schedules B1,B2 note: three separate schedules for each of the units from D. McLaughlin, P.Eng. received on June 7, 2005 recieved the eletrical drawing ( S. Nemetz,) on june 29 2005 forwarded to the fire department for review on July 5, 2005 |
| Application Status: | COMPLETED |
| Permit Value: | $3,600,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | June 08, 2005 |
| File Close Date: | December 12, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6950 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2005-12-12 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)