BP108654 - 71 Summit -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP108654 - 71 Summit -- Scanned
Neighbourhood: Rutherford    
Street Address: 71 Summit -- Scanned
Type of Application: Single / Two Family Dwelling
File Number: BP108654
Date Application Submitted: April 18, 2005
Application Description: One-story sfd, unfinished basement on sub-basement and crawlspace with attached double garage.

Revision - Sept. 12/05 - Open deck added at front and additional covered deck at lower rear. Floor plan layouts revised as noted and rough-in for bar sink added in the basement. DG
Application Status: COMPLETED
Permit Value: $175,000.00
Building Area: 265.32 M2
2,855.88 ft2
Builder: AMBIENCE CONSTRUCTION LTD
Issued Date: May 25, 2005
File Close Date: October 24, 2005

Associated Properties

Address Zone More
71 SUMMIT DRIVE R5 Property Report

Process Steps

Task Status
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

FAILED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

PASSED

2005-10-24

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.