BP108562 - 1 4890 Rutherford -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108562 - 1 4890 Rutherford -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 1 4890 Rutherford -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP108562 |
| Date Application Submitted: | March 29, 2005 |
| Application Description: |
Jordans Carpets - 20 ft X 20 ft storage addition to existing Jordans Carpets. 1hr FRR supplied from the new addition side, 45 minute FRR for roof. Building "C" Reclassified Group E 3.2.2.59 two storeys, unsprinklered combustible or non-combustible construction, 45min FRR for floors, supporting structure and roofs. x-reference BP108187. Rational to allow increase of floor area to 1571.16m2 by N. Zottenberg Architect. Fire alarm system for entire building as part of previous equivalency by davidporion architech inc . 2 hr existing fire separation in building C to remain as part of the equivalency. |
| Application Status: | COMPLETED |
| Permit Value: | $20,000.00 |
| Builder: | MONTROYAL CONTRACTING LTD |
| Issued Date: | April 22, 2005 |
| File Close Date: | October 28, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4890 RUTHERFORD ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2005-10-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)