BP108360 - 1124 Selkirk
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108360 - 1124 Selkirk | |
|---|---|
| Neighbourhood: | Westwood |
| Street Address: | 1124 Selkirk |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP108360 |
| Date Application Submitted: | January 27, 2005 |
| Application Description: |
Two storey sfd, built in double garage on slab with suite on first floor.(all floor areas finished) May 4 / 05 revision - new copy of floor plan showing beam support - LK June 1 / 05 revision - rear deck changed - CB Aug 17 / 05 - one additional washer and 100 sq ft deck - remove laundry door. cb |
| Application Status: | COMPLETED |
| Permit Value: | $197,600.00 |
| Building Area: |
272.43 M2 2,932.41 ft2 |
| Issued Date: | March 15, 2005 |
| File Close Date: | January 05, 2006 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1124 SELKIRK DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
EXCAVATION
Excavation of soil, prior to placing forms. |
FAILED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
FAILED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2006-01-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)