BP108202 - 3592 Bonnie Drive

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP108202 - 3592 Bonnie Drive
Neighbourhood: Hammond Bay    
Street Address: 3592 Bonnie Drive
Type of Application: Single / Two Family Alteration
File Number: BP108202
Date Application Submitted: November 29, 2004
Application Description: Demolish existing garage. New 24 x approx 50 ft garage/carport/rear entrance room with loft over. Remove mansard roof, add gable roof and minor interior renovations to existing single family dwelling.

Feb. 17, 06 Carport changed to garage, revision to loft, windows added, self-closure required at garage door for spatial. VS
Application Status: COMPLETED
Permit Value: $250,000.00
Building Area: 151.60 M2
1,631.81 ft2
Builder: RW (BOB) WALL LTD
Issued Date: February 28, 2005
File Close Date: February 01, 2007

Associated Properties

Address Zone More
3592 BONNIE DRIVE R1 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

FAILED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2007-02-01

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.