BP108185 - 1533 Estevan - units 5, 6 &4b -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP108185 - 1533 Estevan - units 5, 6 &4b -- Drawings Scanned/Attached
Neighbourhood: Newcastle/Brechin    
Street Address: 1533 Estevan - units 5, 6 &4b -- Drawings Scanned/Attached
Type of Application: Commercial / Multi-Res Alteration
File Number: BP108185
Date Application Submitted: November 23, 2004
Application Description: Expansion of Bank of Montreal - add 133.32m2 previous unit 4b to make 517.74m2 "D" occupancy. Remove existing 8" hollow concrete block non-conforming 2 hr firewall between unit 5 and unit 4b. Replace with non-combustible 2 hr firewall equivalency by GHL Consultants Ltd. between Bank of Montreal and unit 4a. Equivalency to replace the existing block firewall does not make the building comply with 1998 BCBC but provides an equivalent or better protection than the firewall it replaces.

Existing 1957 building, combustible, unsprinklered, 2892.8m2 building with partial Firewall (non-conforming) between West unit 12 (1295m2) and remainder of building; centre area (601m2) now divided from 996.58m2 East side by 2 hr Firewall (created under equivalency).
Application Status: COMPLETED
Permit Value: $650,000.00
Building Area: 517.74 M2
5,572.90 ft2
Builder: P C L CONSTRUCTORS CANADA INC
Issued Date: February 10, 2005
File Close Date: June 10, 2005

Associated Properties

Address Zone More
1533 ESTEVAN ROAD CC3 Property Report

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2005-06-10

FINAL-OLD

Final approval as per requirements on plans.

PASSED

2005-06-21

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.