| Neighbourhood: | Pleasant Valley |
| Street Address: | 3944 Excalibur |
| Type of Application: | Locate Permit |
| File Number: | BP108151 |
| Date Application Submitted: | November 16, 2004 |
| Application Description: |
to locate 25' x 60' double wide manufactured home on concrete foundations with crawlspace and to construct an attached 20' x 20' single garage on lot 195. MHR#90128 CSA#51305 SER#2941 Physical file scanned and attached Dec 12/08 |
| Application Status: | COMPLETED |
| Permit Value: | $11,000.00 |
| Building Area: |
160.25 M2 1,724.91 ft2 |
| Builder: | RETIRE WEST COMMUNITIES LTD |
| Issued Date: | January 11, 2005 |
| File Close Date: | November 15, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3950 BIGGS ROAD | AR1 , R12 | Property Report |
| 3944 EXCALIBUR STREET | R12 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)