BP108102 - 4-1850 Northfield -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108102 - 4-1850 Northfield -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 4-1850 Northfield -- Drawings Scanned/Attached |
| Type of Application: | Leasehold Improvements |
| File Number: | BP108102 |
| Date Application Submitted: | November 04, 2004 |
| Application Description: |
Interior design office - Interconnected floor space "Group D" meets 3.2.8.6). Suite area = 137m2 lower floor, 76m2 upper floor . 45 min. Fire separtions for the floor assembly and the loadbearing supports. Provide fire stopping for the plumbing. Reclassified building to 3.2.2.72. in order to have interconnected floor space. Building area = 571m2 , sprinklered, fire alarm , combusible building. Existing firewall divided building into two buildings. |
| Application Status: | COMPLETED |
| Permit Value: | $19,000.00 |
| Building Area: |
213.00 M2 2,292.71 ft2 |
| Builder: | ISLAND WEST COAST DEVELOPMENTS |
| Issued Date: | November 25, 2004 |
| File Close Date: | September 12, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4 1850 NORTHFIELD ROAD | I3 | Property Report |
| 1850 NORTHFIELD ROAD | I3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2005-09-12 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)