BP108101 - 2250 Labieux Road -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP108101 - 2250 Labieux Road -- Drawings Scanned/Attached
Neighbourhood: Northfield    
Street Address: 2250 Labieux Road -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP108101
Date Application Submitted: November 04, 2004
Application Description: New 70 x 115 ft St John Ambulance Training Centre
Part 3, Group A, Division 2, Accessible, Building Classification 3.2.2.27, building area 699m2, sprinklered, fire alarm. Storage Garage 9.3% of GFA. 1.5 FFR/FS for separation between the storage garage and adjacent occupancies. Janitor room Fire separation. Panic hardware on doors Occupant load 200 persons. Double classrooms occupant load maximum 60 person. Exposed building face on South left side 45min FRR, combustible. Automatic door opener on entrance.
2004-Dec-22 - documents sent to Corp Admin and returned 2004-Dec-29. LM

2004-Dec-31 Covenant & Priority Agreement sent to LTO for registration.LM
2005-Jan-07 - covenant (Subsidence) registered at LTO - EX001848
Application Status: COMPLETED
Permit Value: $600,000.00
Builder: ISLAND WEST COAST DEVELOPMENTS
Issued Date: December 24, 2004
File Close Date: May 30, 2005

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2005-05-30

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.