| Application Description: |
Triplex - see bp107355 for foundation, underslab plumbing, site servicing, perimeter drains and access. Triplex - two storeys - sprinklered by bylaw- End Unit 1 - 2347 Bowen Road - 115.47m2 Mid Unit 2 - 2349 Bowen Road - 113.52 m2 End Unit 3 - 2351 Bowen Road - 115.47 m2 xreference bp106719 for servicing plan |
| Application Status: | COMPLETED |
| Permit Value: | $213,568.22 |
| Builder: | WILCO CONSTRUCTION LTD |
| Issued Date: | January 06, 2005 |
| File Close Date: | June 01, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2347 BOWEN ROAD | COR1 | Property Report |
| 2349 BOWEN ROAD | COR1 | Property Report |
| 2351 BOWEN ROAD | COR1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2005-06-01 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)