BP108082 - 6380 McRobb (Parent) Phase 5 -- Foundation
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108082 - 6380 McRobb (Parent) Phase 5 -- Foundation | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6380 McRobb (Parent) Phase 5 -- Foundation |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP108082 |
| Date Application Submitted: | March 09, 2004 |
| Application Description: |
Foundation - 2 Duplexes Type 1 Foundation permit only, construction shall not proceed beyond the foundation stage until the permit for the remainder of the building is issued. x reference bp108043 for the permit for the remainder. This permit includes forms and perimeter drains inspection only. 2 Foundations for duplexes - crawl space - All Type 1 6347 - 6349 Pinewood Lane 6351 - 6353 Pinewood Lane |
| Application Status: | COMPLETED |
| Permit Value: | $88,448.00 |
| Builder: | HAZELWOOD HOLDINGS LTD |
| Builder: | BAYWOOD GLASS INC |
| Issued Date: | November 02, 2004 |
| File Close Date: | July 13, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6347 PINEWOOD LANE | R8 | Property Report |
| 6349 PINEWOOD LANE | R8 | Property Report |
| 6351 PINEWOOD LANE | R8 | Property Report |
| 6353 PINEWOOD LANE | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2005-07-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)