BP108055 - 39 Commercial Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP108055 - 39 Commercial Street | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 39 Commercial Street |
| Type of Application: | Leasehold Improvements |
| File Number: | BP108055 |
| Date Application Submitted: | October 21, 2004 |
| Application Description: |
Existing "A2" suite divided into two tenant spaces - lobby with 3/4 hr FRR added at rear to access new suite and provide second exit for "A2" suite. Pita Pit 136.56m2 "A2" suite and new unleased 67.68m2 "E" retail space to be separated by a 2 hr FRR. Washrooms for Pita Pit include 1 existing, 2 new washrooms, 1 meeting the accessibility requirements. Washroom for retail tenant to be installed as part of future tenant complete and occupy. Existing Building 664.7m2 reclassification under BCBC 1998 - 3.2.2.25. A-2, 2 storeys on crawl space facing 1street, combustible construction; floor assemblies, mezzanines, roof and loadbearing walls and supports if of combustible construction require 3/4 hr FRR. |
| Application Status: | COMPLETED |
| Permit Value: | $65,000.00 |
| Building Area: |
204.24 M2 2,198.42 ft2 |
| Issued Date: | December 10, 2004 |
| File Close Date: | November 25, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 37 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2005-11-25 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)