BP107994 - 85 Tenth -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP107994 - 85 Tenth -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 85 Tenth -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP107994 |
| Date Application Submitted: | October 04, 2004 |
| Application Description: |
Warehouse and offices for Ace Courier Services Reference BP108061 for Foundation and on-site servicing permit. Part 3 building, Pre-engineered steel building, Building classification 3.2.2.71., Total building area = 691.4 m2, Group F2, Warehouse area = 545.3 m2 offices 146.1 m2. Sprinklered. No fire alarm. Accessible ramp to main entrance. 1 accessible washroom, 1 other male washroom. 2004-Dec-20 - Documents to LTO for registration, covenant and priority agreement. chqs 124156,125529,124157,125530 |
| Application Status: | COMPLETED |
| Permit Value: | $280,000.00 |
| Builder: | MCINTOSH G A CONSTRUCTION LTD |
| Issued Date: | December 21, 2004 |
| File Close Date: | June 22, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 85 TENTH STREET | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2005-06-22 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)