BP107966 - 841 Maughan - SCANNED

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP107966 - 841 Maughan - SCANNED
Neighbourhood: Duke Point    
Street Address: 841 Maughan - SCANNED
Type of Application: Commercial / Multi / Industrial
File Number: BP107966
Date Application Submitted: September 24, 2004
Application Description: Propane Tank Painting - 114.46m2 paint shop with 115.93m2 attached covered processing area. Accessible washroom. Paint room to conform to the requirements of the Fire Code. 2 hr fire separation between service room and paint shop.
Application Status: COMPLETED
Permit Value: $74,000.00
Issued Date: December 07, 2004
File Close Date: May 19, 2005

Associated Properties

Address Zone More
841 MAUGHAN ROAD I4 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2005-05-19

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.