BP107746 - 79 Captain Morgans Blvd.

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP107746 - 79 Captain Morgans Blvd.
Neighbourhood: Protection Island    
Street Address: 79 Captain Morgans Blvd.
Type of Application: Locate Permit
File Number: BP107746
Date Application Submitted: July 26, 2004
Application Description: To locate a one storey single family dwelling on a new crawlspace foundation on this site. Work includes interior and exterior alterations to the building as shown on the approved plans.

2004-Sep-22 - Covenant/Priority Agreement sent to LTO. Chq. #'s 124152/125525/124151/125524. LM

Documents registered at LTO - EW128569 24-Sep-04 and EW128570 24-Sep-04. LM

2005-jan-18 - woodstove passed
Application Status: COMPLETED
Permit Value: $23,000.00
Building Area: 157.50 M2
1,695.31 ft2
Issued Date: September 13, 2004
File Close Date: February 15, 2006

Associated Properties

Address Zone More
79 CAPT MORGANS BOULEVARD R3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe Connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
SOLID FUEL BURNING APPLIANCE

For the inspection of a solid fuel burning appliance

FAILED
SOLID FUEL BURNING APPLIANCE

For the inspection of a solid fuel burning appliance

PASSED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

CANCELLED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.