BP107687 - 204 Captain Morgans
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP107687 - 204 Captain Morgans | |
|---|---|
| Neighbourhood: | Protection Island |
| Street Address: | 204 Captain Morgans |
| Type of Application: | Locate Permit |
| File Number: | BP107687 |
| Date Application Submitted: | July 09, 2004 |
| Application Description: |
relocate house on new foundation, work includes interior and exterior renovations, adding a fireplace and covered deck. plans reprinted from file set, engineered plans attached for timber framing. 04/12/06 KM 2009-JUL-17 Folder at Tom W's desk - see attachments. BCLS Certificate of Location attached db |
| Application Status: | COMPLETED |
| Permit Value: | $10,000.00 |
| Building Area: |
204.95 M2 2,206.06 ft2 |
| Issued Date: | August 23, 2004 |
| File Close Date: | September 22, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 204 CAPT MORGANS BOULEVARD | R3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
|
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)