BP107620 - 1483 Bowen
Neighbourhood: Northfield    
Street Address: 1483 Bowen
Type of Application: Leasehold Improvements
File Number: BP107620
Date Application Submitted: June 23, 2004
Application Description: August 3, 2004 revised drawing for one of the H/C washrooms attached to plans. JB
Nov. 4, 04 revised drawing for location of H/C washroom in centre suite VS Dec. 31, 04 revised again adding second washroom in centre suite and deleting changes to washroom in right hand suite.
Jan 17, 05 revised centre suite to include extra sink. VS
Creating new tenant space for office. Adjoining suite retail. Improvements include adding demising wall with 45 min. fire separation to underside of roof, new storefront door and window, new exit door at rear, moving 3 washroom all to be accessible and installing 3 awnings. Suite with Retail use requires 2 exits maximum travel distance allowed 30m. Suite with Office use 1 exit ok. maximum travel distance 25m.
Building 334.44 m2 unsprinklered block construction with existing block wall dividing one third of the building.
Application Status: COMPLETED
Permit Value: $15,000.00
Issued Date: July 20, 2004
File Close Date: April 03, 2006

Associated Properties

Address Zone More
1483 BOWEN ROAD COR3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

FAILED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

FAILED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final Approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final Approval as per requirements on plans.

FAILED
FINAL-OLD

Final Approval as per requirements on plans.

FAILED
FINAL-OLD

Final Approval as per requirements on plans.

PASSED

2006-04-03

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.