BP107616 - 114 - 59 Wharf Street -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP107616 - 114 - 59 Wharf Street -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 114 - 59 Wharf Street -- Drawings Scanned/Attached |
| Type of Application: | Leasehold Improvements |
| File Number: | BP107616 |
| Date Application Submitted: | June 23, 2004 |
| Application Description: |
Downtown Credit Union - Malaspina College - 107.75m2 "D" occupancy - tenant improvements consist of interior partitition walls, accessible washroom and kitchenete sink (non-combustible plumbing required), dropped ceiling, dropping sprinklers and adding 3 heads and raised floor over existing concrete slab. Combustible construction allowed in floor as per 3.1.5.8.(2) BCBC Building - 2099m2 two-storey, sprinklered with fire alarm, non-combustible building on existing parkade building. 3.2.2.22 of 1992 BCBC applies: 1 hour floors, mezz, roof, etc. Reclassified under 1998 BCBC as 3.2.2.24 A-2 sprinklered with fire alarm, non-combustible construction, 1 hr floors, mezz and supporting assemblies. |
| Application Status: | COMPLETED |
| Permit Value: | $55,000.00 |
| Building Area: |
107.75 M2 1,159.81 ft2 |
| Builder: | ARGO CONTRACTING LTD |
| Issued Date: | July 19, 2004 |
| File Close Date: | November 15, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 59 WHARF STREET | DT1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2004-11-15 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.