BP107571 - 5660 Edgewater Lane
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP107571 - 5660 Edgewater Lane | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 5660 Edgewater Lane |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP107571 |
| Date Application Submitted: | June 11, 2004 |
| Application Description: |
Apartment - 40 units - Multi family (Mayfield at Longwood) Four storey wood frame residential Group C with concrete underground (basement) parking, Group F3, Sprinklered with fire alarm. Underground parking area = 1849.43m2, first storey (building area per BCBC) = 1349.55m2, 2nd storey = 1309.3m2, 3rd storey = 1347.32m2, 4th storey = 957.61m2. Building Classification: 3.2.2.45, Combustible or non-combustible construction, 1 hr FS, for floor assemblies and 1 hr FRR supporting floor, Roof 1 hr FS and 1hr FRR for supports of roof (for suite separation consideration), 1.5 hr between the storage garage and other occupancies. 1 hr. FS, 50 STM between the residential suites and remainder of building. 1-hr. FS public corridors, duct shafts through parkade 1.0 hr FS, duct shafts through residential 45min FS, exterior balconies no rating, Ducts shafts through common attic 1hr FS. Accessible to building entrance and from parking area. Stairs, guards and ramps to comply with BCBC. |
| Application Status: | COMPLETED |
| Permit Value: | $4,800,000.00 |
| Builder: | INSIGHT DEVELOPMENTS |
| Issued Date: | November 02, 2004 |
| File Close Date: | November 22, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 101 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 102 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 103 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 104 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 105 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 106 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 107 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 108 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 109 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 110 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 111 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 201 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 202 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 203 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 204 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 205 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 206 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 207 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 208 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 209 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 210 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 211 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 301 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 302 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 303 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 304 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 305 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 306 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 307 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 308 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 309 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 310 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 311 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 402 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 404 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 405 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 406 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 407 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 409 5660 EDGEWATER LANE | R1 , R8 | Property Report |
| 410 5660 EDGEWATER LANE | R1 , R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2005-11-22 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)