BP107447 - 5360 Rutherford -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP107447 - 5360 Rutherford -- Drawings Scanned/Attached
Neighbourhood: Linley Valley    
Street Address: 5360 Rutherford -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP107447
Date Application Submitted: May 14, 2004
Application Description: First phase of the 25 unit townhouse development - 2 duplexes
This permit includes the site servicing and the landscaping
10 Phase multi-family development consisting of 12 duplex and 1 single family dwelling
Duplex
Block 12, unit 24 - 5747 Garnet Place - 142.88m2, garage 44.46m2
Block 12, unit 22 - 5749 Garnet Place - 142.88m2, garage 50.14m2
Duplex
Block 13, unit 25 - 5746 Garnet Place - 142.88m2, garage 50.14m2
Block 13, unit 23 - 5748 Garnet Place - 167.88m2, garage 44.46m2 (bonus room added)
March 16, 05 - 25m2 Bonus room added to 5748 Garnet Place creating 2nd floor. 1 hr FRR/fire separation required between suites in this duplex. VS
Application Status: COMPLETED
Permit Value: $482,000.00
Builder: GEORGIA VIEW HOME BUILDERS LTD
Issued Date: December 10, 2004
File Close Date: October 12, 2005

Associated Properties

Address Zone More
5749 GARNET PLACE R6 Property Report
5748 GARNET PLACE R6 Property Report
5746 GARNET PLACE R6 Property Report
5747 GARNET PLACE R6 Property Report
5360 RUTHERFORD ROAD R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

FAILED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
WATER CONNECTION

Pipe and connection must be visible for inspection.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2005-06-27

OCCUPANCY-OLD PASSED

2005-06-29

OCCUPANCY-OLD PASSED

2005-07-04

OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2005-10-12

FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.