BP107377 - 121 Bastion Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP107377 - 121 Bastion Street | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 121 Bastion Street |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP107377 |
| Date Application Submitted: | May 04, 2004 |
| Application Description: |
Appr'd June 25,04 CONST. OF THE PLUMBING SHALL NOT PROCEED UNTIL THE DRAWINGS ARE ACCEPTED BY THE CITY.Alterations at main entrance and second and third floor and the exterior facade (adding new windows);adding storage room, 1st storey; washroom modifications 2nd & 3rd storey, sprinklers throughout to the NFPA13. modifications 2nd floor by removal of existing suite walls to create one common suite and removal of one interior suite wall to create larger suite. Summary Building Description: A2 lower floor, 3.2.2.24(2) 1 hr. (noncomb. by equivalency CFT Eng. ,1999))/Group C, 2nd and 3rd floors combustible, 45min fire separation , no rating roof, corridors 45min FS.,exiting is by an exterior exit stair (by equivalency Locke MacKinnon, 1994 report) and the other exit is central interior stair which is separated from the remainder of the building. Suite separation is 45min FRR. Partly sprinklered previously lower and East End, xreference bp10502 and bp41330 for equivalency reports |
| Application Status: | COMPLETED |
| Permit Value: | $200,000.00 |
| Issued Date: | June 01, 2004 |
| File Close Date: | August 12, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 121 BASTION STREET | DT1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2004-08-16 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)