BP107190 - 156 Captain Morgans Blvd. -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP107190 - 156 Captain Morgans Blvd. -- Scanned | |
|---|---|
| Neighbourhood: | Protection Island |
| Street Address: | 156 Captain Morgans Blvd. -- Scanned |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP107190 |
| Date Application Submitted: | March 17, 2004 |
| Application Description: |
Two story single family dwelling, wood appliance (masonry chimney - great room) crawlspace, detached workshop-rec room Covenant sent to LTO for registration April 26, 2004. Chq # 119440 - subsidence 2004-Apr- 20 - covenant registered at LTO - EW49068 July 8 / 05 - Revision - flat roof added between house and accessory building. CB |
| Application Status: | COMPLETED |
| Permit Value: | $192,080.55 |
| Building Area: |
280.20 M2 3,016.04 ft2 |
| Issued Date: | April 27, 2004 |
| File Close Date: | July 23, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 156 CAPT MORGANS BOULEVARD | R3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
COVENANT PREPARATION
type covenant, applicant to sign, city to notorize. Completed means that the covenant is ready to send to LTO. Completed status will create the task to track LTO registation |
COMPLETED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
CANCELLED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
CHIMNEY
To be inspected while all components and clearances are visable |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
CANCELLED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2009-07-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)