Street Address: 3956 Victoria Avenue -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP107186
Date Application Submitted: March 17, 2004
Application Description: Wellington Beer & Wine Store - 185.41m2 addition to existing 388.48m2 wine & beer store, upgrade to existing building face. New store 573.89m2 Part 9 combustible building sprinklered by bylaw.

4" fire line and hydrant installed by City Forces at cost to developer.
Application Status: COMPLETED
Permit Value: $74,500.00
Builder: ISLAND WEST COAST DEVELOPMENTS
Issued Date: April 06, 2004
File Close Date: August 30, 2004

Associated Properties

Address Zone More
3956 VICTORIA AVENUE CC2 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2004-08-30

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.