BP106952 - 104 - 2010 Boxwood Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106952 - 104 - 2010 Boxwood Road | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 104 - 2010 Boxwood Road |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP106952 |
| Date Application Submitted: | January 15, 2004 |
| Application Description: |
received B1,B2 for equivalency by Andrew Harmsworth, P.Eng. on April 1, 2004. Create Unit #104 , Group F, Division 2 , Suite area, 299m2, adding new mezzanine 30% , 89m2, visually open to below, single egress stair from the mezzanine and is at maximum travel distance. adding toilet room for persons with disabiliites with standard shower. 45min demising walls to underside of roof. New sprinklers under mezzanine. Water curtain at rear of mezzanine designed in accordance to the equivalency report by A. Harmsworth.(x-reference bp103897) Building Description Building Classification 3.2.2.71, Group F Division 2, one storey with mezzanine . Pre-engineered building. Sprinklered for bylaw only. No floor or roof rating required. Exposing building face on the right side is required to be 2 hr FRR noncombustible. Equivalency report by A. Harmsworth provided for sprinklers as equivalent to the required fire resistance ratings. |
| Application Status: | COMPLETED |
| Permit Value: | $12,400.00 |
| Builder: | WINDLEY INVESTMENTS LTD |
| Issued Date: | February 10, 2004 |
| File Close Date: | June 22, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2010 BOXWOOD ROAD | I3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2004-06-22 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)