BP106841 - 6380 McRobb (parent) Phase 1&2 Foundation 6370-6380 Applecross SL1-6 VIS5544
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106841 - 6380 McRobb (parent) Phase 1&2 Foundation 6370-6380 Applecross SL1-6 VIS5544 | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6380 McRobb (parent) Phase 1&2 Foundation 6370-6380 Applecross SL1-6 VIS5544 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP106841 |
| Date Application Submitted: | November 06, 2003 |
| Application Description: |
Foundation permit only, construction shall not proceed beyond the foundation stage until the permit for the remainder of the building is issued. x reference bp106746 for the permit for the remainder. This permit includes forms and perimeter drains inspection only. 3 foundations for duplexes - crawl space - All Type 2 - sprinklered by bylaw - 6370 (unit 10)- 6372 McRobb (9) - 161.48m2 + 37.4m2 garage 6374 (unit 8) - 6376 McRobb (7) - 161.48m2 + 37.4m2 garage 6378 (unit 6) - 6380 McRobb (5)- 161.48m2 + 37.4m2 garage |
| Application Status: | COMPLETED |
| Permit Value: | $125,720.00 |
| Builder: | HAZELWOOD HOLDINGS LTD |
| Builder: | BAYWOOD GLASS INC |
| Issued Date: | December 03, 2003 |
| File Close Date: | July 09, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6370 MCROBB AVENUE | R8 | Property Report |
| 6372 MCROBB AVENUE | R8 | Property Report |
| 6374 MCROBB AVENUE | R8 | Property Report |
| 6376 MCROBB AVENUE | R8 | Property Report |
| 6378 MCROBB AVENUE | R8 | Property Report |
| 6380 MCROBB AVENUE | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2004-07-09 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)