BP106837 - 6180 Clayburn
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106837 - 6180 Clayburn | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6180 Clayburn |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP106837 |
| Date Application Submitted: | December 01, 2003 |
| Application Description: |
Triplex - two storeys - sprinklered - End - 6180 Clayburn 73.11 m2 main 73.9m2 upper-22.34m2 att'd garage. Mid - 6182 Clayburn 69.86 m2-main 74.87m2upper23.48m2 att'd garage. End - 6184 Clayburn 73.11m2--main 73.9m2 upper21.73m2 att'd garage. |
| Application Status: | COMPLETED |
| Permit Value: | $305,900.00 |
| Builder: | 1085499 BC LTD |
| Issued Date: | January 20, 2004 |
| File Close Date: | July 28, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6184 CLAYBURN PLACE | R5 | Property Report |
| 6182 CLAYBURN PLACE | R5 | Property Report |
| 6180 CLAYBURN PLACE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
CANCELLED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2004-07-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)