BP106748 - 2000 Island Hwy -Jan 20,04 address changed to 1980 Island Hwy "Tim's"

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP106748 - 2000 Island Hwy -Jan 20,04 address changed to 1980 Island Hwy "Tim's"
Neighbourhood: Departure Bay    
Street Address: 2000 Island Hwy -Jan 20,04 address changed to 1980 Island Hwy "Tim's"
Type of Application: Commercial / Multi / Industrial
File Number: BP106748
Date Application Submitted: November 06, 2003
Application Description: Tim's Hortons - 261.40 m2. Group A, Division 2 , Sprinklered , Fire Alarm, Building Classification 3.2.2.27, Occupant load = 65 persons. Two exits. Accessible. Jan 20, 04 address changed to 1980 Island Hwy. revised drawings approved 04/jan 31
Application Status: COMPLETED
Permit Value: $450,000.00
Builder: TDL GROUP LTD
Issued Date: January 07, 2004
File Close Date: April 26, 2004

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
OCCUPANCY-OLD PASSED

2004-04-26

FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.