BP106746 - 6380 McRobb (Parent) Phase 1&2 6370-6380 Applecross SL1-6, VIS5544 -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106746 - 6380 McRobb (Parent) Phase 1&2 6370-6380 Applecross SL1-6, VIS5544 -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6380 McRobb (Parent) Phase 1&2 6370-6380 Applecross SL1-6, VIS5544 -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP106746 |
| Date Application Submitted: | November 06, 2003 |
| Application Description: |
duplexes - 2 storeys - All Type 2 - sprinklered by bylaw - site servicing on this permit 6370 (unit 10)- 6372 McRobb (9) each unit = 161.8m2 + 37.4m2 garage 6374 (unit 8) - 6376 McRobb (7) each unit = 161.8m2 + 37.4m2 garage 6378 (unit 6) - 6380 McRobb (5) each unit = 161.8m2 + 37.4m2 garage x reference bp106841 for the foundations. xreference bp046036 for DCC credits |
| Application Status: | COMPLETED |
| Permit Value: | $502,880.00 |
| Builder: | HAZELWOOD HOLDINGS LTD |
| Builder: | BAYWOOD GLASS INC |
| Issued Date: | December 17, 2003 |
| File Close Date: | July 09, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6370 MCROBB AVENUE | R8 | Property Report |
| 6372 MCROBB AVENUE | R8 | Property Report |
| 6374 MCROBB AVENUE | R8 | Property Report |
| 6376 MCROBB AVENUE | R8 | Property Report |
| 6378 MCROBB AVENUE | R8 | Property Report |
| 6380 MCROBB AVENUE | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2004-07-09 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.