BP106539 - 1061 Maughan - scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP106539 - 1061 Maughan - scanned
Neighbourhood: Duke Point    
Street Address: 1061 Maughan - scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP106539
Date Application Submitted: August 29, 2003
Application Description: added two sinks Jan 12, 2003, includes sprinklers throughout the building, includes found'n for leanto.
Phase 1 (this permit); Relocate 2 storey office building (existing Part 9 building) to new foundation and convert use to a Group F Division 2 (medium Hazard occupancy) food processing plant on the 1st storey (194m2) and (future permit) convert the use on the second storey (179.6m2) to a caretaker dwelling unit; Group C (residential). Scope of work involves new foundation, upgrading of the existing floor system and new common lobby to a 2-hr fire separation/fire resistance rating(FRR/FS)50STM. Floor assembly required to be 2hr FS/FRR/50STM, Plumbing is noncombustible . 2-hour fire dampers on the ducts are to be provided for any penetrations within the required fire separations. Existing sprinkler system to be upgraded. accessible main floor and washroom for persons with disabilities. Separate permit required to complete and occupy the upper floor and the future addition.
Application Status: COMPLETED
Permit Value: $50,000.00
Builder: PRECISION CIVIL INSTALLATIONS LTD
Issued Date: October 23, 2003
File Close Date: October 22, 2004

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2004-10-22

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.