BP106517 - 512 Campbell
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106517 - 512 Campbell | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 512 Campbell |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP106517 |
| Date Application Submitted: | August 25, 2003 |
| Application Description: |
Addition of 69.3m2 to main floor (existing office) for additional office space. Left (West) side - (exposed building face) is required to be non-combustible with a 1 hour fire resistance rating. Adding plumbing (noncombustible) . Single exit (45min FS) from third storey through lobby 45 min. FS. 1 hr fire separation with 50 STM between office and residence on lower floor. 45 min. fire separation between the office floors 2nd and 3rd storey. 45 min. fire separtion for the roof . Accessible entrance/ two exits provided on the 2nd storey. Upgrading the guards on the exit stairs and ramp to comply with the B.C. Building Code. Part 9 building, unsprinklered, three storeys, Group C, first storey (192m2)and Group D 2nd (164m2) and 3rd (42.3m2) storey, |
| Application Status: | COMPLETED |
| Permit Value: | $75,000.00 |
| Builder: | GOODALL R LORNE M D INC |
| Issued Date: | October 22, 2003 |
| File Close Date: | November 26, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 512 CAMPBELL STREET | DT8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2004-11-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)