BP106517 - 512 Campbell

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP106517 - 512 Campbell
Neighbourhood: Downtown/Old City    
Street Address: 512 Campbell
Type of Application: Commercial / Multi-Res Alteration
File Number: BP106517
Date Application Submitted: August 25, 2003
Application Description: Addition of 69.3m2 to main floor (existing office) for additional office space.
Left (West) side - (exposed building face) is required to be non-combustible with a 1 hour fire resistance rating. Adding plumbing (noncombustible) . Single exit (45min FS) from third storey through lobby 45 min. FS. 1 hr fire separation with 50 STM between office and residence on lower floor. 45 min. fire separation between the office floors 2nd and 3rd storey. 45 min. fire separtion for the roof . Accessible entrance/ two exits provided on the 2nd storey.
Upgrading the guards on the exit stairs and ramp to comply with the B.C. Building Code.

Part 9 building, unsprinklered, three storeys, Group C, first storey (192m2)and Group D 2nd (164m2) and 3rd (42.3m2) storey,
Application Status: COMPLETED
Permit Value: $75,000.00
Builder: GOODALL R LORNE M D INC
Issued Date: October 22, 2003
File Close Date: November 26, 2004

Associated Properties

Address Zone More
512 CAMPBELL STREET DT8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2004-11-26

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.