BP106417 - 2908 Robson (lot: 2) (previously 2910 Robson)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106417 - 2908 Robson (lot: 2) (previously 2910 Robson) | |
|---|---|
| Neighbourhood: | Departure Bay |
| Street Address: | 2908 Robson (lot: 2) (previously 2910 Robson) |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP106417 |
| Date Application Submitted: | July 30, 2003 |
| Application Description: |
For construction of a new 48' x 46' two story, single family dwelling with built-in double garage. It has a partial crawl space and a roof deck. 2003-Sep-11 - Covenent registered on Title - EV106657 - Subsidence 2003-Oct-17 - Easements registered on Title - EV122843 - this is for access only not services 2003-Oct-21 - The easement for services are still not registered. They must be registered prior to framing inspection. Cal Paley, the builder was informed on this. |
| Application Status: | COMPLETED |
| Permit Value: | $170,000.00 |
| Building Area: |
270.34 M2 2,909.91 ft2 |
| Issued Date: | September 29, 2003 |
| File Close Date: | April 30, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2908 ROBSON ROAD | R1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2004-04-30 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)