BP106412 - 981 Maughan - SCANNED

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP106412 - 981 Maughan - SCANNED
Neighbourhood: Duke Point    
Street Address: 981 Maughan - SCANNED
Type of Application: Commercial / Multi / Industrial
File Number: BP106412
Date Application Submitted: July 29, 2003
Application Description: International Composting Corporation Facility - ICC
2 New Pre-engineered buildings and on-site servicing.
Main building, Processing Plant and Offices, Group F, Division 2, sprinklered with fire alarm system . Building Classification 3.2.2.72.
Main Floor = 1987.5m2 and enclosed mezzanine = 85.56m2 (mezzanine is 4.27% ). No rating required for the mezzanine floor. Providing accessible toilet room and access from parking for persons with disabilities. No rating required for the exposed building faces.
Security/Sales building, 61.78m2, Part 9, sprinklered, area = 61.78m2.

Application Status: COMPLETED
Permit Value: $980,050.00
Builder: L D C MANAGEMENT LTD
Issued Date: November 05, 2003
File Close Date: June 03, 2005

Associated Properties

Address Zone More
981 MAUGHAN ROAD I4 Property Report

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

CANCELLED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2005-06-03

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.