BP106244 - 130 - 3200 Island Hwy

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP106244 - 130 - 3200 Island Hwy
Neighbourhood: Rutherford    
Street Address: 130 - 3200 Island Hwy
Type of Application: Commercial / Multi / Industrial
File Number: BP106244
Date Application Submitted: June 05, 2003
Application Description: Great Canadian Oil Change Building,
X reference bp106198 for site servicing for the building.
Part 9 Building, non-combustible construction , Group F, Division 2, = total floor area 308m2, Main floor Area = 3 car service bays 154m2, two exits , toilet room for persons with disabilities, Service Pit 154m2 non-combustible construction , steps are non-combustible , slip resistant , 2 means of egress from the pit . Occupant load 9 persons. To comply with NFPA 88B, 2-7; Pits and sub-floor work areas.
Application Status: COMPLETED
Permit Value: $250,000.00
Builder: LARRY L D INDUSTRIES INC
Issued Date: July 22, 2003
File Close Date: December 01, 2003

Associated Properties

Address Zone More
3200 ISLAND HIGHWAY N CC3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD PASSED

2003-12-01

FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.