| Application Description: |
Aspengrove School.(independent)(relocated existing modular school) 611m2, 1 storey ,Combustible construction permitted, sprinklered (existing), fire alarm(existing) , modular building, Group A, Division 2, Building Classification 3.2.2.27, sprinkler system is required to be monitored and electrically supervised, accessible for persons with disabilities, provided one accessible toilet room, existing panic hardware, East side of building for the exposed building face = 45min FRR existing, Occupant load = 149 persons, 2 exits. New entrance, stairs and accessible ramps ( see notations on approved plans for heights etc.. Remote Fire Department connection. |
| Application Status: | COMPLETED |
| Permit Value: | $176,000.00 |
| Issued Date: | June 27, 2003 |
| File Close Date: | September 23, 2003 |
Process Steps
| Task | Status |
|---|---|
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2003-09-23 |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)