BP106149 - 2465 Lynburn Cres

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP106149 - 2465 Lynburn Cres
Neighbourhood: Departure Bay    
Street Address: 2465 Lynburn Cres
Type of Application: Single / Two Family Alteration
File Number: BP106149
Date Application Submitted: May 15, 2003
Application Description: Front right: Add 20x34 ft master bedroom with garage below.
Left side: Close in carport and add 4x14 ft at left side and 5x12 ft at rear

see bp106205 for access

Amended plans Aug. 21,03 added window and door , bathroom and moved laundry. VS
Application Status: COMPLETED
Permit Value: $80,000.00
Building Area: 40.10 M2
431.63 ft2
Builder: SUPERB CONSTRUCTION LTD
Issued Date: June 03, 2003
File Close Date: March 18, 2005

Associated Properties

Address Zone More
2465 LYNBURN CRESCENT R5 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

CANCELLED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2005-03-18

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.