BP106064 - 172 Pirates Lane
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP106064 - 172 Pirates Lane | |
|---|---|
| Neighbourhood: | Protection Island |
| Street Address: | 172 Pirates Lane |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP106064 |
| Date Application Submitted: | April 23, 2003 |
| Application Description: |
One and one-half story single family dwelling, crawlspace July 10, 2003 sent to LTO for registration of covenant - Subsidence. Chqs 109819 to 109820. July 14, 2003 covenant registered at LTO - EV075268 |
| Application Status: | COMPLETED |
| Permit Value: | $80,000.00 |
| Building Area: |
125.46 M2 1,350.44 ft2 |
| Issued Date: | July 03, 2003 |
| File Close Date: | July 13, 2004 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 172 PIRATES LANE | R3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
|
CHIMNEY
To be inspected while all components and clearances are visable |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place for inspection |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place for inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2004-07-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.