BP105984 - 5758 Broadway

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP105984 - 5758 Broadway
Neighbourhood: North Slope    
Street Address: 5758 Broadway
Type of Application: Single / Two Family Alteration
File Number: BP105984
Date Application Submitted: April 01, 2003
Application Description: 602 sqft Accessory building at left side of property.

2003-May-15th - Board of Variance granted appeal to increase the maximum height of an accesory building from 4.5 meters (14.76 feet) to 5.35 meters (17.55 feet), subject to a building permit being issued within three months (2003-August-15).
Application Status: COMPLETED
Permit Value: $37,000.00
Builder: GROUP 2 DEVELOPMENTS LTD
Issued Date: May 27, 2003
File Close Date: October 07, 2003

Associated Properties

Address Zone More
5758 BROADWAY ROAD R5 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

FAILED
STORM CONNECTION

Pipe and Connection must be visible for inspection

CANCELLED
STORM CONNECTION

Pipe and Connection must be visible for inspection

CANCELLED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

CANCELLED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

CANCELLED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

CANCELLED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2003-10-07

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.