BP105854 - 1975 Boxwood - Building B - 1969 Boxwood - Building A

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP105854 - 1975 Boxwood - Building B - 1969 Boxwood - Building A
Neighbourhood: Northfield    
Street Address: 1975 Boxwood - Building B - 1969 Boxwood - Building A
Type of Application: Commercial / Multi / Industrial
File Number: BP105854
Date Application Submitted: March 03, 2003
Application Description: 2 new sprinklered F2 warehouse shell bldgs with fire alarm containing 10 potential units to be developed by tenant improvement sep permits reqd for plumbing & tenant occupancies.
Building A - Part 9 bldg 398 m sq sprinklered combustible or non-combustible bldg. Right building face to have 2hr FRR, non-combustible cladding.
Building B - Part 3 bldg 749 m sq, 3.2.2.72 BCBC 1998 sprinklered, facing 2 streets, combustible or non-combustible construction, 45min FRR for floors & supports. Right bldg face to be 2 hr FRR, non-combustible construction with non-combustible cladding. Left face (across from building A) to be 2 hr FRR with non-combustible cladding.
Oct 22, 03 Completely open mezzanine 48.3m2 with office space and washroom framed in below added to Unit 10, Bldg B. No FRR for floor & support required. Revision to Sprinkler drawings & hydraulic calc submitted max travel dist. is 32.8' (1 m) to exit stairs in mezzanine
Physical File Scanned + attached Oct 6, 2008 db
Application Status: COMPLETED
Permit Value: $400,000.00
Builder: RW (BOB) WALL LTD
Issued Date: April 22, 2003
File Close Date: March 29, 2006

Associated Properties

Address Zone More
1975 BOXWOOD ROAD I3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

FAILED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2006-03-29

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.