BP105474 - 6000 Nelson Road -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP105474 - 6000 Nelson Road -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 6000 Nelson Road -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP105474 |
| Date Application Submitted: | November 19, 2002 |
| Application Description: |
Phase Two - 5 units 2 duplexes, 1 sfd Duplex 5982 Blairmore Place; Plan 3B- 121.24m2 garage 39.35m2 5978 Blairmore Place; Plan 1-190.46m2 garage 37m2 Duplex 5997 Blairmore Place; Plan 2; 140.73m2 garage 42.29m2 5993 Blairmore Place; Plan 2; 140.73m2 garage 42.29m2 SFD 5977 Blairmore Place:Plan 4; 132.9m2 garage 37.16m2 |
| Application Status: | COMPLETED |
| Permit Value: | $530,000.00 |
| Builder: | STRATA CORP VIS5270 |
| Issued Date: | December 06, 2002 |
| File Close Date: | December 05, 2003 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 5982 BLAIRMORE PLACE | R6 | Property Report |
| 5978 BLAIRMORE PLACE | R6 | Property Report |
| 5997 BLAIRMORE PLACE | R6 | Property Report |
| 5993 BLAIRMORE PLACE | R6 | Property Report |
| 5977 BLAIRMORE PLACE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2003-12-05 |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)