BP105292 - 2005 Boxwood
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP105292 - 2005 Boxwood | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2005 Boxwood |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP105292 |
| Date Application Submitted: | October 07, 2002 |
| Application Description: |
Addition added 25 x 72, and sprinklered canopy along side. added sprinkler structural and revised equivalency to permit. Feb 3, 2003.JB - Building area revised to 835m2 (see alternative solution) Atlas Truss Building see bp105291 for foundation permit Building Area (BCBC) 668.9m2 plus enclosed mezzanine 65.4m2 and open mezzanine = 41 m2. Building area revised to 835m2 (see alternative solution) Building Classification:3.2.2.71. Group F2. Accessible in public and office area. One storey. Open Mezzanine <40%, enclosed mezzanine <10%. No rating required. No fire alarm. Sprinklered by bylaw not by code. Unprotected opening permitted by code 32.8%. Building Code Equivalency Report for protection of openings and for the 1hr exposed building faces. Maximum travel distance = 30m to exit. Three required to meet travel distance. Maximum travel distance on mezzanine to egress stair 10m. (3.4.2.2.) Maximum opening in guard = 8". Mezzanine Guard height 42"on stairs 36" |
| Application Status: | COMPLETED |
| Permit Value: | $210,800.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | November 12, 2002 |
| File Close Date: | October 03, 2003 |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2003-10-03 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)